Short Lead Time for Floating Booster Pump - Heavy Duty Industrial Dredging Mineral Centrifugal Slurry Pump – Relong
Short Lead Time for Floating Booster Pump - Heavy Duty Industrial Dredging Mineral Centrifugal Slurry Pump – Relong Detail:
Design Features
Power End
✔ Labyrinth bearing isolators to protect internal components during wash-down cycles.
✔ Clearances can be easily adjusted to maintain efficiency while optimizing performance and extending wear life.
✔ Over-sized, self-aligning spherical roller bearings for trouble free operation.
✔ Heavy duty bearing assembly, 50,000 hour minimum L10 bearing life, Distortion free bearing clamp system ensures maximum bearing life and prevents premature fatigue.
Wet End
✔ Maintenance friendly split casing for elastomer liners (lined wet end).
✔ Static vanes reduce wear and prevent erosion.
✔ Tangential discharge improves efficiency and reduces wear.
✔ Optimized hydraulics for high efficiency and low wear.
✔ Dowel pins for easy and accurate split case alignment (lined wet end).
✔ Ribs designed for optimized strength/weight.
✔ Static suction vanes extend wear life (metal wet end).
✔ Patented flange system for ease of maintenance (metal wet end).
✔ Adjustable suction cover on sizes 200 and larger to optimize efficiency and minimize wear.
Sealing arrangements
✔ Packed gland with expeller configuration (other sealing options available).
✔ Split stuffing box for simplified installation and adjustments.
✔ Mating shaft sleeves with engineered materials for extended life.
Performance Parameters
Applications
The Slurry Pumps are widely used to transport high-hardness, strong-corrosion and high-concentration liquids that contain suspended solid particles, such as finished ores, refuse ores, ashes, cinders, cements, mud, mineral stones, lime and etc. in the industries of metallurgy, mining, coal, power, building material and etc. The temperature of the pumped solid-liquid mixture should be ≤80℃, and the weight concentration should be ≤60.
Product detail pictures:
Related Product Guide:
Our eternal pursuits are the attitude of regard the market, regard the custom, regard the science as well as the theory of quality the basic, have confidence in the very first and management the advanced for Short Lead Time for Floating Booster Pump - Heavy Duty Industrial Dredging Mineral Centrifugal Slurry Pump – Relong , The product will supply to all over the world, such as: Austria, Philadelphia, Kuwait, To win customers' confidence, Best Source has set up a strong sales and after-sales team to deliver the best product and service. Best Source abides by the idea of Grow with customer and philosophy of Customer-oriented to achieve cooperation of mutual trust and benefit. Best Source will always stand ready to cooperate with you. Let's grow together!
By Ann from British - 2018.12.11 11:26
The customer service reprersentative explained very detailed, service attitude is very good, reply is very timely and comprehensive, a happy communication! We hope to have a opportunity to cooperate.
By Mary from Belize - 2017.09.29 11:19